SOUTH CLUSTER:

GROWING PRODUCTION VOLUMES

  • A large existing deposit with a long reserve life in the bottom quartile of the PGM cost curve
  • Feasibility study, design documentation and contractor selection have been completed
  • In 2022, construction permits were obtained for all the mine facilities
  • Construction of the underground mine and related infrastructure is in progress
Ramp-up to design capacity in 2022–2027 (mln t)
2027–2028 mining targets
Ore 9 mln t
Ni 13+ kt
Cu 20+ kt
PGMs 750-850 koz