SOUTH CLUSTER:
GROWING PRODUCTION VOLUMES
- A large existing deposit with a long reserve life in the bottom quartile of the PGM cost curve
- Feasibility study, design documentation and contractor selection have been completed
- In 2022, construction permits were obtained for all the mine facilities
- Construction of the underground mine and related infrastructure is in progress