BYSTRINSKY GOK

  • Follow-up exploration is planned on the flanks of the Bystrinskoye deposit
  • In 2022, the iron ore concentrate production section and the chemical analysis laboratory were upgraded
  • Plans for 2023 include further upgrades to the concentrator’s milling section
274 mln t
ore reserves, grading
28 years
life of mine
Cu ~0.73 %Calculated to the JORC Code as at 1 January 2023.
USD 934 mln
2022 EBITDA
Fe ~14.60 %Calculated to the JORC Code as at 1 January 2023.
50.01 %
Nornickel’s interest in the mining industry’s major greenfield project"
Production volumes
2022 2023E
OreProcessed ore volumes. 10.6 10.8 mln t
Cu in concentrate 67.2 66.6 kt
Iron ore concentrate 2.5 2.8 mln t