BYSTRINSKY GOK
- Follow-up exploration is planned on the flanks of the Bystrinskoye deposit
- In 2022, the iron ore concentrate production section and the chemical analysis laboratory were upgraded
- Plans for 2023 include further upgrades to the concentrator’s milling section
274 mln t
ore reserves, grading 28 years
life of mine Cu ~0.73 %Calculated to the JORC Code as at 1 January 2023.
USD 934 mln
2022 EBITDA Fe ~14.60 %Calculated to the JORC Code as at 1 January 2023.
50.01 %
Nornickel’s interest in the mining industry’s major greenfield project" 2022 | 2023E | ||
OreProcessed ore volumes. | 10.6 | 10.8 | mln t |
Cu in concentrate | 67.2 | 66.6 | kt |
Iron ore concentrate | 2.5 | 2.8 | mln t |