ENERGY INFRASTRUCTURE

UPGRADE PROGRAMME

THE PROGRAMME’S GOAL:

Accelerated replacement of obsolete equipment, mitigating physical risks and improving long-term reliability.

Gas and gas condensate exploration, production and transportation

  • Construction of a new 70+ km gas and gas condensate pipeline (Pelyatkinskoye–Messoyakhskoye)
  • Upgrade of 150+ km of gas and gas condensate pipelines
  • Ramp-up of gas well drilling at the Pelyatkinskoye field beyond 2028

Heat and water supply networks

  • Accelerated replacement of 110-kV and 220-kV power lines (over 1,000 km)
  • Upgrades of heat and water supply networks

CONTRIBUTION TO ENERGY EFFICIENCY:

Reinforced emphasis on higher output of the new generating units at СHPPsСHPP — combined heat and power plant. and TPPs and comprehensive energy loss reduction throughout the electricity value chain

Combined heat and power plants

  • Replacement of two power generating units at CHPP-2 and installation of two new generating units at CHPP-3
  • The new equipment is significantly more powerful and fuel efficient, ensuring minimal energy losses

Hydropower plants

  • Upgrade of all seven hydraulic turbines at Ust-Khantayskaya HPPHPP — hydropower plant. is completed.
  • Upgrade of the Kureyskaya HPP
  • The HPP upgrade is aimed at expanding the installed capacity and improving efficiency to boost low-carbon hydropower capacity