ENERGY INFRASTRUCTURE
UPGRADE PROGRAMME
THE PROGRAMME’S GOAL:
Accelerated replacement of obsolete equipment, mitigating physical risks and improving long-term reliability.
Gas and gas condensate exploration, production and transportation
- Construction of a new 70+ km gas and gas condensate pipeline (Pelyatkinskoye–Messoyakhskoye)
- Upgrade of 150+ km of gas and gas condensate pipelines
- Ramp-up of gas well drilling at the Pelyatkinskoye field beyond 2028
Heat and water supply networks
- Accelerated replacement of 110-kV and 220-kV power lines (over 1,000 km)
- Upgrades of heat and water supply networks
CONTRIBUTION TO ENERGY EFFICIENCY:
Reinforced emphasis on higher output of the new generating units at СHPPsСHPP — combined heat and power plant. and TPPs and comprehensive energy loss reduction throughout the electricity value chain
Combined heat and power plants
- Replacement of two power generating units at CHPP-2 and installation of two new generating units at CHPP-3
- The new equipment is significantly more powerful and fuel efficient, ensuring minimal energy losses
Hydropower plants
- Upgrade of all seven hydraulic turbines at Ust-Khantayskaya HPPHPP — hydropower plant. is completed.
- Upgrade of the Kureyskaya HPP
- The HPP upgrade is aimed at expanding the installed capacity and improving efficiency to boost low-carbon hydropower capacity
Gas and gas condensate exploration, production and transportation
Combined heat and power plants
Heat and water supply networks
Hydropower plants
Gas transportation